[4.57]
This shows a southward-looking
view of Derby Jct. in 1902, just prior to the removal of the station seen here. The station build date, however, does
not go back to 1871 but rather to the 1880 pooling agreement that also added track and a 40x65-ft plank platform between the
two railroads. At that time, the 1871 "old 'shanty' was pushed down the track some rods" [DTR/02/06/1880/03].
The pooling agreement, a urged for almost a decade, caused the Derby Transcript to intone "Peace henceforth all along our borders" [DTR/01/30/1880/03], that 'peace' resulting in
a 15% increase in total receipts in the first month [NHER/02/19/1880/04; DTR/04/09/1880/02]. Usage of each other's
tracks from Derby Jct. to Ansonia in times of need also showed cooperation thereafter. In August of 1880, while the NH&D's trestle across the meadows was being refurbished and possibly the
new covered bridge into Ansonia was being installed, passengers bought tickets and accessed NH&D trains at
the NRR's Derby station [NHER/08/21/1880/04; 03/27/1884/02,04; 03/28/1884/01]. While there was no accusation
of collusion, both roads were chided for charging the same 10-cent rate for the two-mile ride from Ansonia to either
Birmingham or Derby, seen as excessive compared with two or three cents per mile charged elsewhere [NHER/11/30/1884/01].
The NRR dropped its fare to a nickel. The Derby, for the moment, did not follow
suit [NHWP/11/19/1887/04]. Rate complaints would be among the reasons for building the horse-turned-electric road
that emerged as the Ansonia, Derby & Birmingham RR in 1887. See below at MP 4.66.2. The open waiting shed to the right of the station was added in 1886 as a shelter for passengers and baggage
in bad weather [NHDP/01/25/1886/03]. With the coming of the new NRR passenger and freight stations at Ansonia in early
1887, the newspaper also said that future transfers of cars would probably take place there and not at Derby Jct. as in the
past. The NH&D had complained on several occasions about this NRR practice as delaying Derby line trains and inconveniencing its passengers [NHDP/04/03/1886/03]. [ADD REFS: NHER/04/25/1884/02; NHER/01/14/1887/02; NHER/03/07/1879/04; NHER/11/17/1880/01; NHER/02/06/1879/04; DTR/02/20/1880/03]

|
| Derby Historical Society |

[4.57.1] The shot on the left is from the Images of America Derby book [p76]. It is a westward view of Derby Jct., with the actual crossing of the
tracks seen in the far left. The woodcut on the right shows this building with a roof outcropping also
on the west side, there for the hoisting of freight from ships at the river's edge.
Leman Stone built this warehouse reportedly ca. 1790 and it is seen here sometime time after the 1871 arrival of the NH&D
whose track is the one about to cross the river to Birmingham. The other track is correctly labeled in the lower right as the NRR. The person sitting on one of the old freight bays is
probably waiting for a train, the freight business of which has undoubtedly contributed the ruination of the old warehouse
structure. Stone was a well-known businesman and active in civic affairs. He was also the agent for the Paugussetts, the Native
American tribe whose reservation was just south of here on Turkey Hill.

|
| Leroy Roberts Collection |

|
| Thomas J. Dodd Research Center, UConn |
[4.58] Here are photos of the NRR Derby station,
also called Derby-Birmingham, on the the east side of the Naugatuck River. There are additional shots [click here and here]. The latter of these two links shows this station to be at the foot of the bridge
over to Birmingham, Derby's central and downtown borough until it was merged with the town to form the city of Derby
in 1893. In 1896, probably to reflect this, the railroad changed the name of the old NH&D station in Birmingham to Derby
and the name of the NRR station seen here to East Derby [HC/06/26/1896/11]. The East Derby station was torn down in
1904 to the relief of locals tired of what had become an eyesore and in favor of the road widening that the removal allowed
[ES/08/30/1904/06].

|
| TylerCityStation Collection |
[4.59] NHD&A #2, which, unlike the other four original engines, was never named for a railroad official,
is reportedly posed here on the trestle crossing the Naugatuck River just above its confluence with the Housatonic, approximately
where the railroad bridge is today from East Derby to Derby. The engine is most
likely either at the northern end of Hog Island headed for Ansonia or at the southern tip of the Birmingham mainland
and approaching the Howe truss bridge into Derby Jct. That point had been the intended terminus of the NH&D, which was planning just to interchange
with the NRR here. Jeremiah H. Bartholomew, a business associate of Anson Greene Phelps [see MP 4.63.3], was reportedly the
one who pushed the very sensible idea of the NH&D going to Birmingham and Ansonia to serve and profit from the many factories
and businesses in those places [HOTD: 25-27]. Bartholomew would go on to be an NH&D director as well as its third
president.

|
| Boston Public Library |
[4.59.01] This is from the Bailey 1875 bird's-eye map of Ansonia. See below at MP
4.65. This is the original bridge, a wooden truss structure, at the NH&D's upper crossing of the Naugatuck
River into Ansonia. The bridge here at Derby Jct. was presumably similar. Upgraded bridges at both places installed in
1880 [CRC (1881) 28: 15-16] were also wooden structures but covered for protection from the elements [CRC (1879) 26: 25].
The contract for a new iron bridge at Derby Jct. was awarded to Murray, Dougal and Co. of Milton, PA, with a price
tag of $5,065 [NHER/05/09/1879/04; NHDP/05/10/1879/04; NHER/05/12/1879/04] but the
builder reneged owing to a steep rise in the cost of iron [NHDP/04/26/1880/04]. The 205-ft bridge here was constructed instead
by A.D. Briggs & Co. of Springfield at a cost of about $4,300 [NHJC/11/10/1879/02; NHER/11/17/1879/01]. A temporary trestle
was put up so trains could bypass the work on this new bridge, which was finished in mid-April of 1880 [DTR/02/20/1880/03;
DTR/04/16/1880/03]. Briggs would also put up the new one at Ansonia, which the Palladium misreports as being
in Naugatuck. It is not known whether there were any iron components at all in these bridges but wood and iron bridges
did exist [click here. Murray, Dougal was known more for building
railroad cars than bridges and became one of the companies that merged in 1899 to form American Car and Foundry [click
here].

|
| TylerCityStation Collection |
[4.59.1] This is a close-up of the Derby map from the 1868 Beers atlas of New Haven County. While it shows NH&D complete all the way to Ansonia, the portion from Derby Jct., only added to
the plans in 1868, is the projected route. The right-angled crossing of the river into Ansonia is not
the diagonal crossing that was actually built in 1870-1871. The Shelton canal and Ousatonic Dam (extreme left),
both of which only opened in 1870, are also seen. The NRR, operational for some 20 years already, is shown
with the safer route it chose on the east side of the Naugatuck River. The NH&D route here would be largely
on trestle at the start through the flood plain, called 'the flats' or 'the meadows.'
In this low-lying area, nevertheless, there were once several residences now reduced to one house seen on the map above
on Old Town Rd., a trotting park [NHER/01/23/1891/01], and a cave where 'brigands' hid out until an NH&D
engineer reported them [NHER/11/30/1884/01; 12/01/1884/04]. This was a precarious balancing act for a fledgling
railroad that was determined to serve Birmingham and Ansonia through the repeated floods that the river has always been noted
for. Also seen are the extensive waters of the Birmingham canal, west of the river and wider than it at some points,
that went right down into the center of the borough to power the industries there. The
Birmingham Water Co. dam that diverted flow into the canal can be seen as the line across the river below the NH&D
crossing on this and other maps. The lower channel into the canal is not seen here but is shown on the map at MP 4.71.1
below.

|
| UConn Libraries |

|
| Connecticut Historical Society |
[4.60] The item to the left
is an 1898 overview of Derby Jct. Click here for the full Landis and Hughes map. The 1880 NH&D depot is in the lower left and the NRR's 1848 Derby depot
is at the lower right. The 1880 covered bridge is also seen. The Extension now diverges west on Hog Island. Note also the curved riverfront trestle that was put in to serve the Alling,
aka Paugassett, Mills and the Bassett Co. When the Extension was being laid out, these important Birmingham apparel-makers wanted
it to be on their side of the Housatonic to better serve them and not make Shelton more competitive. While some Sheltonites
resisted the railroad for other reasons [see Track 5, MP 5.5], the spur was enough to make the mill owners drop their
opposition [NHER/07/18/1888/01; RRC23.108 (5/18/1889)]. The view
is largely replicated in the CHS photograph to the right.

|
| Connecticut Historical Society |



[4.60.1] The image from CHS at top
left shows the southern end of East Derby, with its small commercial enclave by the river. We were never really sure of the
orientation of this photo until we matched the tall smokestack of the Derby Lumber Co. with the image on the 1898 bird's-eye
map. This helps to clarify that the track all the way to the right is the NRR and the ones in the foreground are the NH&D.
They cross at Derby Jct. to the far right. The photograph probably dates to the
1890s, based on the box car that we think says HRR. That road would be leased by the NYNH&H in 1892
and its rolling stock re-lettered for the new owner sometime thereafter. In the far left one can see
the coal transfer that passed over the tracks of both railroad companies, themselves on trestle in this marshy area. The photo
on the right comes from the Illustrated Review of the Naugatuck Valley
[p26] and is a wonderful corroboration of the bird's-eye map, showing W.B. Bristol's coal plant in better detail
with its "automatic railway, built in 1886" running overhead. Steamboats and barges had tied
up since the 1840s at the Derby docks landing and trolley service was briefly provided from here to
Birmingham and Ansonia: see below at MP 4.66.2. The trolley track was later cut back to the causeway bridge to downtown Derby
that can be seen on the full 1898 map. [lowleft add5/15]

|
| Connecticut Historical Society |

|
| TCS Collection |
[4.60.2] This panoramic CHS photo puts a somewhat different perspective on Derby Jct.
The shot was apparently taken from atop High St. in East Derby. In the bottom at river level, the Derby Jct. triple bridge
is seen through the trees. In the center, the Extension, now the double-tracked Maybrook line, heads west across the Housatonic
River. To the right, one sees the Birmingham spur along the river's east bank. The 'lumber' sign is prominent
and the advertising card image to the right shows it belongs
to the United Lumber & Supply Co. that was apparently the predecessor of the today's Housatonic
Lumber. In the distance on the card, a train on
the Extension crosses into Shelton.

|
| UConn Libraries Valuation Map Collection |
[4.61]
This is the 1915 valuation map showing Derby Jct. Click here for the full map section. The track at the left arrow is the old NRR
mainline, dead-ended since 1904 or so at Main St., just off the bottom edge of the map. The dangerous grade
crossing there was one of the reasons for rerouting the line to the other side of the Naugatuck River in 1903. The
opening of the new Derby station at that time also enabled the East Derby station to be torn down in 1904. The old NRR
track from Ansonia down to Division St. on the east side of the river was left in place. The triple-tracked, three-span railroad
bridge across the Naugatuck River was finished in 1904 [CRC53.1905.26]. This composite structure, which was built
as three side-by-side bridges on piers that spanned the entire triple width, replaced the old 1880 covered bridge. Iron for the new bridges reportedly arrived in December, 1903 and work was expected
to be completed by February [ES/12/09/1903/09]. By August of 1904, the out-of-service covered bridge was gone [ES/08/05/1904/07].
Some of the NH&D main is still in place on the map at the arrow on the right with access to the Derby riverfront
siding reconfigured to come off it from the south instead of the reverse loop from the north before. The mammoth double-tracking
and relocation project required numerous property transfers from here to Ansonia between the NYNH&H and its
leased NRR and NH&D roads as the latter were still legal entities at the time. These transfers can be traced in the
New Haven and Derby Index Map volume at NHMHS. Derby Jct., thus expanded and
modernized, would be increased in importance when car-weighing scales were put here in 1906 [ES/05/11/1906/12].

|
| J.J. Harness Collection. Copyright NHRHTA, used with permission |

|
| Copyright NHRHTA, Inc. |
[4.61.1] At left,
SS B-253, Derby Jct. tower, in a valuation photo taken by J.J. Harness on May 13, 1931. The tracks are immediately behind
the tower and the triple bridges across the Naugatuck River are a little farther to the right of the tower. Engine
#1612 is shown in front of tower in the photo at right

|
| Copyright NHRHTA, Inc., used with permission |

|
| Copyright NHRHTA, Inc., used with permission |

|
| Don Woodworth Photo - Copyright NHRHTA, Inc., used with permission |


|
| TCS Collection |
[4.61.2] A Derby Jct. quintet! The upper left is NYNH&H #496, a Schenectady K-1-a, built
in 1896, with 20x28-inch cylinders and 63-inch drivers, formerly NYNH&H #427. The Derby Jct. tower sign can
be seen in front of the engine's smokebox. The upper right photo is #2461, a T-2-b ALCO built at the Richmond
Works in April of 1913 with 19x26-inch cylinders and 51-inch drivers. The middle left shot of the DERS engines was taken
by Don Woodworth on December 18, 1964. The nearer engine is DERS-2c #560. The
middle right photo [add6/14] is CNE #162. The bottom left shot is thought to
be in the late 1940s with FA #0415 on the point leading a train up the Naugatuck line. That easternmost bridge would be removed
in 1955 after being damaged by the hurricanes of that year. Here all three look well maintained as does the causeway trestle
both to Derby on the left and to Shelton on the right.

|
| New Haven Register |

|
| Thomas J. Dodd Research Center, UConn |

|
| Thomas J. Dodd Research Center, UConn |
[4.61.3] Here are three views of Derby Jct. after the flooding of August, 1955. The right and lower shots are Charles
Gunn photos. The upper left image still shows the three bridges. The picture ran in the Register five years to the
day after the flood [NHER/08/19/1960/22]. Note the reflection in the water of the helicopter overhead. This may be the Marines "whirly-bird" that is taking NHRR Pres. McGinnis for another look at the damage
on August 24 after the copter mistakenly landed on the New Haven Green looking for him the day before [NHER/08/23/1955/03].
The right shot is along Rte. 34 in East Derby. The bridge closest to the photographer in the middle shot was taken down after
this because of the weakening of one of the piers. It almost looks like some of the upper cross pieces are missing or buckled
on this span in the top shot. The white color of some parts of the bridges is unexplained unless it was some kind of preservative
being applied when the floods hit. There is an informative thread covering the tracks and bridges here at the
NHRHTA Forum [click here]. Also, there is an interesting shot of Derby Jct., which appears to show the east bridge out later in 1955. Click
here and scroll down to the three Ansonia pictures, the first and third of which are mislabeled, being the Derby freight
house and Derby Jct. respectively. In the latter, the lack of the outer diagonal on the northeast end seems
to corroborate the removal of the eastern span. The crane sitting in the water probably was involved in the work and caught by
the October 14 surprise second flood, which set back the railroad's recovery efforts considerably. After this, Derby
Jct. would have two bridges with a track each for the Naugatuck and the Berkshire lines. Our 1956 timetable map shows double-tracking
still in place to Ansonia. North of there it was reportedly removed in January, 1950. The lower photograph here looks
toward Derby Jct. still with three bridges, so this is clearly between the first and second floods. The split for the Extension
is in the upper middle, with the second Berkshire line track washed away and to be replaced shortly. The workers are
standing by the switch for the old Alling Mills siding into Derby.

|
| TylerCityStation Collection |

|
| TylerCityStation Collection |

|
| TylerCityStation Collection |
[4.61.4]
Derby Jct. ca. December 1980, with two shots of the bridge looking across the Naugatuck River toward Derby.

|
| TylerCityStation Collection |

|
| TylerCityStation Collection |
[4.61.5] Two views on March 21, 2009.
The upper shot shows the piers with concrete end-caps. This was done when
the eastern span was removed after taking most of the battering by water, lumber, and other 1955 flood debris, with
the masonry cut back to support just the two remaining bridges. Exactly when this work was completed is unclear. The
newspapers said the Maybrook track, the one seen here on the western span, was back in freight operation on
August 25 [HC/08/26/1955/10; ES/08/25/1955/09]. As pictured in the newspaper, what looks like a full-size construction crane
was hoisted up to the top of the bridge for quicker clearing of the track [ES/08/26/1955/??. Restored access to
the Naugatuck line was not expected until the early part of 1956 [ES/12/01/1955/06]. The lower shot here shows the
two surviving bridges. The track on the middle span, seen at right here, was reportedly removed in 1964 when the
deteriorated wooden trestle work on the north end was replaced with a single track that splits there for the
former Naugatuck and Berkshire lines.

|
| TylerCityStation Collection |

|
| TylerCityStation Collection |
[4.61.5]
Two shots looking back at the bridge to Derby Jct. in December 1980, including the Waterbury train of that era heading for
the Derby station.

|
| Dave Peters Collection |

|
| Dave Peters Collection |

|
| George E. Votava photo. Leroy Roberts Collection |

|
| TCS Collection |
[4.61.6] The two upper shots look back at the
area called the Derby Loop, with the wye track to the right going toward Shelton and Maybrook that allowed trains to avoid
the heavy NY&NE grades between Hawleyville and Hartford. The Besler steam train approaches Derby station on 11/11/1936.
This is train 456 operating from Bridgeport to Waterbury, according to information on the photo. The post card appears to be a stylized rendition of same train heading back to Bridgeport. The two-unit,
air-conditioned streamliner was 163 feet long and had seats for 152 passengers. It first ran test runs from New Haven to Bridgeport,
then up to Waterbury and Hartford and back to the Elm City on 8/19/1936. [REFS: HC/08/19/1936/03]

|
| TylerCityStation Collection |
[4.62] Birmingham Iron Foundry (BIF), which began operations in 1836 as Birmingham Iron and Steel Works, was
one of the large manufacturing concerns to which the Derby road brought direct railroad service. Prior to that, raw materials
and finished goods had to be carted over the Naugatuck River to and from the NRR's Derby station. In this advertisement,
our NH&D train is pulling into the Birmingham station, which is just ahead on its left and across the street
from the factory complex. BIF merged with the Farrel Foundry & Machine Co.,
established in 1848, to become Farrel-Birmingham Industries, rearranging the initialism from BIF to FBI, in
1927. The Farrel Corporation [click here] is still headquartered in Ansonia today.

|
| UConn Libraries |
[4.63] Based on the customary
reliability of the bird's eye artists, this sketch of the Birmingham station is probably pretty accurate. Click here for the full O.H. Bailey 1876 map. This station stood west of the track
at the northeast corner of Foundry and Second Streets, the latter of which would later become Main St. Notice how the ornate office building above 'Foundry' in this shot matches the one in the advertisement just
above. Rockey [2:377] says the Birmingham station opened in March of 1872,
but the Journal says it was nearing completion in December of 1871 [NHJC/12/15/1871/02]. It was largely paid
for and "owned principally" by William E. Downes, who would be on the NH&D board of directors from 1882
to 1889. The importance of this stop to local industry is seen in reports like the one that said a thousand tons of scrap
metal was unloaded here for use at the Birmingham Rolling Mills late in 1879 [NHER/12/16/1879/01]. Before the NH&D,
this would have to have been carted across the river from the NRR's Derby station. The original combination station was
"practically ruined" in a serious fire, arson suspected, on June 30, 1879 [NHER/06/30/1879/04; NHDP/07/01/1879/04;
NHER/08/01/1879/04]. The cost of the new depot was reported [CRC26.1879.186]
to be $4544.01. In 1884, the platform was relaid with chestnut planking [NHER/06/02/1884/04].

|
| TylerCityStation Collection |
[4.63.0] This
venerable structure was once part of the BIF complex. It stood here for years, readily visible from Rte. 8. and
near what used to be the corner of Foundry St. It was set back from Main St. and north of the railroad station. Note
the hoisting apparatus in the air to the right of the building, still seen ca. 1980, as testimony to the heavy 'lifting'
that was done here.

|
| UConn Libraries |

|
| Leroy Roberts Collection |
[4.63.1] The photo
on the right is a rare view of the old NH&D Birmingham station. It corresponds to the 1898 map on the left showing
the depot facilities as they appeared in that year at Birmingham, which had been the city of Derby since 1893. Newspaper reports in 1877 say that the NH&D station has been moved "eighty
feet and now fronts on the main street," as it does in the photo, and also that it has been "enlarged
and made into a passenger and freight depot both" [NHJC/04/09/1877/02]. Moving the passenger station also served to cover
the canal race, "the unsightly and dangerous opening that is now conspicuous there" [NHJC/03/03/1877/02]. This
part of the structure appears to be what is above the red arrow at MP 4.63.3.
[4.63.2] This poster appeared in the 1896 Souvenir
History of Derby and Shelton, Connecticut, published by the local Evening Transcript newspaper. The Sterling
Co. was located on Foundry St. north of BIF and was another of Birmingham's major employers. The mammoth complex of white buildings
seen here is even more distinguishable on color reproductions. Trains are seen on the poster, one southbound on
the NH&D line west of the Naugatuck River and one northbound on the NRR east of the river in the distance. The
water flowing in the foreground is the Birmingham canal. See the note about the canal, which powered the factories here,
at MP 4.63.3 below. Click here for more, through the courtesy of Shelton's Plumb Library.

|
| DiRienzo Collection |
[4.63.3] This shot [rev/21]
of the new Derby depot was most likely taken from high above East Derby on Derby Hill. It appears to be within a week of when the
station opened on Sunday, October 18, 1903, also the day when the 9:35 a.m. train to New Haven was the last
to use the old NH&D depot [ES/10/15/1903/06; 10/17/1903/06; 10/19/1903/07]. The first train to use the new right
of way to the new station on opening day was the 12:27 train from New Haven pulled by engine #201. On board was 35-year veteran
Conductor Edward B. Bradley who had been in charge of the first NH&D train in 1871 and would retire from the
railroad in 1906 [ES/02/07/1930/03]. This new station was said in 1899 to be intended as a 'union station' for
Derby and Ansonia but new structures were built at both locations in 1903 [HC/11/16/1899/03; NHAR 32 (1903)]. The article
probably meant to say this station would mean the elimination of the NRR's East Derby station, which would come down
in 1904. The tearing out of the NH&D track began immediately. The work, which looks to be in progress
here, was necessary to complete the driveway and grounds for the new depot as well as to reinstall the trolley tracks
on Main St. and on the newly built viaduct that is seen at the lower extreme left. The building above the
arrow seems to correspond to the newer freight wing, shown above on the 1898 map. The newspaper said it was being torn down
on October 26, while the original station building had been razed on October 21 [ES/10/ 21/1903/09; ES/10/27/1903/06]. This
may date the photo above to the five days between. The newer freight depot, seen to the right, was opened on October
19. What look like posts along Foundry St. may still be the pilings on which the old NH&D line stood, as seen
on the map at MP 4.63 above. BIF is seen here on Foundry St. in the center and to the extreme right you can see the white
building which marks the start of the Sterling Co. complex. The realignment of the railroad three hundred feet eastward was
to facilitate what was about to become the new route of the Naugatuck Division, here following the old NH&D line from
Derby Jct. to Ansonia. The double-tracking was mostly complete by this time from Naugatuck Jct. to the border with Ansonia,
which had evolved from a borough within Derby to an independent city by 1893. The dividing line was at Old
Town Rd., then appropriately renamed Division St. as it is still known today.

|
| Thomas J. Dodd Research Center, UConn |
[4.63.4] A view of the new Derby depot looking
to the east. A serious fire on December 17, 1913 did significant damage to the building and burned off
the entire roof. It cost a good part again of the original $15,000 station expenditure to repair the structure,
after what was thought to be a gas line explosion and fire [ES/12/17/1913/ 13; ES/12/18/1913/08]. The fear was that in
its "present crippled financial condition" the railroad might leave it as a "leanto" but the
HYNH&H was reportedly rising to the occasion to restore the station
to its former condition. Ironically, perhaps, less than a year after this station opened, the number of passengers taking the
train to New Haven was reportedly down 75%, this after the opening of the Connecticut Railway and Lighting Co. trolley line,
which was doing a booming business [ES/07/28/1904/07]. Of course, the Consolidated was well on its way to taking over the
trolleys, but for a time the competition was adding to its fiscal difficulties. The local press also lamented
that the railroad had failed to install fire hydrants on the property, especially short-sighted in light
of the fact that there was a 6-inch main running to the freight house [ES/12/17/1913/13,16]. The freight siding was to be
lengthened and a passenger car was to be put in place as a temporary station until repairs could be completed [ES12/18/1913/08].
Click here for a postcard sent in 1923, courtesy of Hudsonelectric at the Railfan.net Picture
Archive. The idyllic view and manicured lawns on the card may go back to the 1903 opening. On it, you can just barely
make out the south pillar of the porte cochere, the covered carriage entrance,
on the west side. The freight house is also seen beyond the station on the postcard. Across Foundry St. on
the card, the BIF complex is at the left and the white buildings at the right are those of the Sterling Co. They can
also be seen in the photo above this one.

|
| Al Lawrence Collection; Copyright NHRHTA, used with permission |
[4.63.5] These are the floor plans for the 1903 Derby depot, identified as being part of the Highland Division on
these architectural renderings. We were unaware of any time the Naugatuck Division was jurisdictionally connected with
the Highland but divisional reorganizations did occur on the NHRR from time to time. Phil Blakeslee alludes to this in Lines West [p16].

|
| Photo - Copyright NHRHTA, Inc., used with permission |
[4.63.6] This is a shot of #1413, a Class B-3, 4-4-0 unit built by Rogers Locomotive
Works in 1892, with 19x24-inch cylinder bore/stroke and 68-inch drivers. This was formerly HRR #56, and was renumbered
into the NYNH&H roster in 1892 as #506. You can see the southern edge of the Derby passenger station and canopy to the
left of the engine, which is headed toward Derby Jct. The two-car consist looks like one of the Ansonia locals that was
the legacy of the NH&D. The date is sometime after the 1904 renumbering that made this engine the #1413 and 1920
when the ICC required electric headlights on all locomotives. Based all the evidence, the feeling is that this is ca. 1915.
This engine was scrapped on August 31, 1925, the year in which Derby local passenger service was 'scrapped'
as well.

|
| USGS Image |
[4.63.7] This is a shot from the southwest section
of the 1953 Ansonia USGS topographic quadrangle. Click here for the entire section. It shows pretty much how things were left after
the double-tracking and realignment, done by 1905, and before the havoc of the 1955 floods. The purple arrow shows the
old NH&D main left in place from the north down to the Farrel-Birmingham plant. Foundry St. is no longer seen because
it was condemned in 1908 and the land was sold to BIF and the Sterling Co. The green arrow shows the old riverfront siding
and the black arrow shows the ca.-1918 wye to allow Maybrook eastbound freights to avoid the heavy grades on the Highland
Division by coming down to Shelton and using the 'loop' here. Note how the three river islands have all been joined
to the Derby mainland by now. Interestingly, the foundations of what was reportedly Derby's first factory, an 1837
copper mill, were recently discovered just above the green arrow. Click here. The factory, which was powered by water from the old Birmingham canal, was built
by Sheldon Smith and Anson Greene Phelps, the latter of whom went off on his own to start other metals ventures in Derby's
northeastern borough that would be named Ansonia after him. These operations evolved into Phelps, Dodge & Co,
the successor company of which today still is a metals-mining and manufacturing conglomerate. Click here.

|
| Thomas J. Dodd Research Center, UConn |
[4.63.8]
The Derby station and freight depot in the floods of 1955. Water seems to be up to the top of the platform shed at the
passenger station. The freight depot appears to be standing somewhat taller out of the water. This is identified as a
Charles Gunn photograph taken in August, the first of the two floods of 1955.

|
| TylerCityStation Collection |

|
| TylerCityStation Collection |

|
| TylerCityStation Collection |
[4.64] The top left photo is from 1980 and shows just 'Derby' on
the station sign. The other two views are of the Derby-Shelton station on March 21, 2009. Rte. 8 passes almost
overhead and just to the west. The venerable structure looks quite sharp for having survived fire and flood. Even its
signature porte cochere is still intact. Today the station serves as headquarters for the Valley Council of
Governments covering Ansonia, Derby, Seymour and Shelton. The Valley Transit District operates from the building in the background
in the lower shot. Along with CT Transit, it provides local bus service that stops here for passengers using
the Metro-North Waterbury line. The transit garage sits on the site of the Derby freight house.

|
| J.J. Harness Collection. Copyright NHRHTA, used with permission |

|
| Photo - J.J. Harness Collection. Copyright NHRHTA, used with permission |

|
| Dave Peters Collection |
[4.64.1] Two valuation photos by J.J. Harness showing the Derby freight depot. The upper left view
was shot on May 13, 1931 and shows the east side of the building where rail cars on the siding were unloaded. The photo on
the upper right is of the west side of the depot where the freight was transferred to trucks for local delivery. This
shot was taken on March 12, 1947. The val photo on the lower left is from 1916
and shows the south end of the building.

|
| Dave Peters Collection |

|
| Photo - J.J. Harness Collection. Copyright NHRHTA, used with permission |

|
| Photo - Copyright NHRHTA, Inc., used with permission |
[4.64.2] The left photo is a northerly look
at the Derby Pit area west of the Naugatuck line and so named either for the ash pit or the maintenance facility located here. The lower item
is a 1940 map that shows the layout. Scroll the enlarged map to the left to see this area in detail. The map is from
the NHRHTA's reprint of a volume entitled New Haven Railroad - Mechanical Department Facilities Maps. The photo on
the right is a westerly view and has 'Derby Bus Garage' written on the left. The large engine house-like structure was apparently
used to store and service the new Mack gasoline-powered railbuses. An old coach was set up as a foreman's
office and a locker, tool, and material room for a crew to work on these new vehicles. The Derby location for this facility is hardly coincidental. The NH&D line had become something of a poster-child
for ridership lost to the CR&L trolley competition beginning as early as 1900. The first three railbuses ordered and
received in January of 1922 were for the Derby line [HC/01/08/1922/A5]. This attempt to cut costs and
stave off the abandonment of passenger service here lasted only until 1925. Railbus service did last into the
1930s elsewhere and perhaps this photo, taken on July 22, 1929, indicates that servicing was done at this
facility for some time longer.

[4.64.3] An article in the February, 1922 issue of Railway
& Locomotive Engineering, was entitled: "The New Haven Introduces a Gasoline Car. The text is a follows. "A
gasoline driven car, the first of its kind that has been put in operation on the New York, New Haven & Hartford Railroad,
and known as No. 9000, has been placed in operation on the Derby division between Ansonia and New Haven, where the runs are
short and the traffic not heavy. It is a combination of railroad car and automobile. In its initial trial trip it ran at a
speed of thirty-five miles an hour. The car is twenty-eight feet long and a trifle over nine feet wide, and seats thirty-five
people. Four feet of its length are reserved for baggage. The motor is the same as that used in a Mack truck, and can develop
sixty horsepower. The total weight of the car when fully loaded is estimated at 20,000 pounds. Only two men will be needed
to operate it—the driver and a man to act as baggage man and conductor—and it is understood that if it proves
a success others of the same type will be put in service on other short runs of the system."

|
| TylerCityStation Collection |

|
| TylerCityStation Collection |
[4.64.4] Two views from the area north of the Derby-Shelton passenger
station. The upper shot looks south and the station can be seen in the distance on the right. Looking north from about the
same spot, we can see the track going off to the left where the old Derby Pit area was.

|
| TylerCityStation Collection |
[4.64.5] Concrete loading dock, which dates to a later period than what is shown on the 1940 map above. This
is probably the location of the 'old coach' that served as the foreman's office and tool room. The view looks
north toward Division St.

|
| TylerCityStation Collection |
[4.64.6] We can't be quite certain
but the old railbus facility may have stood where the Beard Concrete Co. building is now. If not, it was in the area in front
of it. The Jersey barriers over on the right block off the area where the yard tracks slanted back into the main.

|
| TylerCityStation Collection |
[4.64.7] The north end of the Derby Pit area
still has rail in the ground that once went back into the main. This corresponds to the 1953 topographic map at MP 4.63.6
above, but on that map the tracks dead-end on the south. The 1940 map above shows the pit area tracks coming in from the south
and dead-ending on the north. Obviously, some reconfiguration took place, even prior to 1953 and before the floods of
1955.

|
| TylerCityStation Collection |
[4.64.8] This is along the Naugatuck line
where Pershing Drive meets Rte. 8 to our right. The view looks south. The abandoned track on the right looks a remnant
of the old southbound track, removed in the early 1960s. The switch up ahead is what we have arbitrarily decided to call 'NH&D
Jct.' This 300-ft or so piece of track was put in 1903 or shortly thereafter to connect with the remnant of the NH&D,
as shown on the 1953 topographic map. This was to reach BIF and the Sterling Co. after their rail access was
cut off with the realignment.

|
| TylerCityStation Collection |
[4.64.9]
This overpass on Rte. 8 has no purpose at present. Back when this portion
of the expressway was built in the late 1940s, it was needed for the BIF connection. Rails are still in the
ground for the track that came off the Naugatuck line, which is now behind us as we are looking west. We accessed this
spot from the parking lot of a small business off Water St. in Derby. The track bends around to our left on the other
side of the overpass and ends as it goes toward where BIF once stood, now the site of a Home Depot that
opened not all that long ago. The Suburban Propane depot that is still on Water
St. continued to get rail shipments via the B&M/Guilford reportedly until
the fall of 1996 when an engine went on the ground there. The dirt road to the right dead-ends in the brush just
behind us.

|
| Derby Historical Society |
[4.65] Ansonia in 1856. The
NRR is just seven years old, having opened to Derby on May 15, 1849, to Waterbury on June 11, and to Winsted on
September 24 [NRRAR, 1850]. The first timetable was dated May 14, 1849. The 1849 Ansonia station (yellow arrow) appears to
have been a combination type for both passengers and freight, similar to the Derby station and others on the early NRR. The structure
at the green arrow looks to be the engine house. In 1884, land for expanded facilities was purchased. They would
be located at the foot of Bank St., not yet built, about where the double-tracking starts. The new brick passenger station
did not open until January of 1887, at which time the engine house was also dismantled and moved to Wheeler's Farms in
Milford as an NRR storage facility [NHWP/ 01/ 19/ 1887/04]. We do not yet know exactly when the freight depot opened
but it may have been as early as the 1884 land purchase. It was built straddling the tail race that emptied water
from the Ansonia canal back into the Naugatuck River (blue arrow). Like Shelton and Birmingham, the canal here powered
Ansonia's factories. The canal is seen on this map running into the reservoir east of Main St. with the tail race
flowing into the river on the left under the blue arrow. The land below Central St., which is at the red
arrow, is where the railroad considered moving the freight operation ca. 1903. See below, especially MP 4.73.

|
| Ansonia Library |
[4.65.1] This valuable panorama of Ansonia
in 1870 is among the treasures we discovered in the historical room at the Ansonia Library [click here]. We did not crop out the family inscription pointing to the home of 'Grandfather' (J.H.) Bartholomew,
third president of the NH&D. What is seen here is one of two surviving photographs, this one now newly examined,
that shows the original 1849 NRR facilities, including the combination station, the large passenger shed
to the right, and its engine house. The locations seem to correspond to the 1856 map above. The shed does not appear
on the 1856 map, either not being considered a structure or not being built yet. It probably had to be taken down for
the NH&D, which would build right along the riverbank, apparently filling in some areas and putting some of its track
on trestle to squeak by the NRR complex. See the 1875 Bailey map below. The fact that the NH&D is nowhere to be seen verifies
that this part of the road was not built as of 1870. Apparently the shed was never replaced, since it is not on the 1875
map either. This photograph appeared in the Register in 1963, misdated as ca. 1890 [NHER/04/26/1963].

|
| Boston Public Library |

|
| Ansonia Library |
[4.65.2] The
map view looks north. It corresponds perfectly with what is seen in the shot from the 1875 Bailey bird's-eye map
[click here]. This map is the only one ever seen to show Derby road facilities in Ansonia in any detail. The truss, carrying the NH&D across the Naugatuck River into
Ansonia. is the 1871 bridge and the
postcard corroborates its appearance. The brushy area on the north end of the truss is probably where the 'brigands' mentioned above [MP
4.59.1] hung out. Both views show the old half-covered structure that carried Bridge St. over the river. Also
seen in the postcard view is the western end of the dam that spanned the entire river to feed the Birmingham Water Co.
canal.

|
| Boston Public Library |
[4.65.3] This shot and the one below are also from the 1875 Bailey bird's-eye map. The appearance of a connection
between the NH&D and the NRR at the passenger station may be one of those rare instances of carelessness by a bird's-eye
artist. If a physical track connection was in place, it certainly was not used for the transfer of freight, a complaint of
the NH&D [NHDP/03/08/1879/04] that was not addressed until the 1880 joint pooling agreement. The structure just
below Bartlett St., also known as Bridge St. and so-named sometime after March, 1884 [NHER/03/06/1884/04],
is identified in the map key as the NH&D station, which we know was for freight and was appropriately located
on a spur track. It opened in December
of 1871 [NHDP/12/09/1871/02] with a "switch track... to the lower wire mill" also being put in at this time. A John
Morrissy was night watchman for the NH&D in Ansonia in early 1884 [NHER/03/14/1884/01]. Note the strategic placement of the pillar crane by the street enable it to hoist cargo from freight cars to wagons
or the depot platform. The crane was likely made by the Farrel Foundry and Machine Company right here in Ansonia,
similar to the one covered in the Scientific American issue of March 24, 1883. Click here. The Connecticut Eastern Railroad Museum recently moved a crane of this type
from Middletown to Willimantic. Click here. The NRR station at Bank St. (top left) is the original one that was shared
and used by passengers taking trains on both roads. James Montgomery Bailey, famed as 'The Danbury News
Man' rode through here in 1873 and had a few interesting things to say. He noted "a formidable line of huge
cannon" at the Ansonia station, probably relics of the recently concluded Civil War in which he served. He says
these were "condemned pieces brought here to be melted into less frightful forms" by a "brass company in Ansonia
that employs six million dollars in capital, and would use more if it was to be got," probably referring to the
Anson Phelps companies. Subscribing to less flattering views of the NH&D, he says... "Here the Derby railroad
terminates its weary self. The intricate history of this route, if properly placed before a dead man, would make him squirm.
If he didn't squirm, it would be on account of ill-health"(!). The exclamation point is ours. Mr. Bailey was known
for his acerbic wit and we believe he was riding the competition, the NRR, as he toured the Valley.

|
| Boston Public Library |

|
| TCS Collection |
[4.66] The end of the NH&D
line was above the Maple St. bridge in an area that was already heavily
industrialized in 1871 and would become more so in the next decades. The railroad commissioners pegged the terminus
at Mechanics St., a point that we need to find on some other historical map [RRC 6:41]. This traffic was undoubtedly
the reason for extending the line to Ansonia in the first place. This shot
shows the two-stall Derby engine house and turntable here, in Wallace's Grove, apparently on land identified with the
industrialist Wallace family. The woodcut shows an additional view of the property and the engine house. The turntable was in place early on to head NH&D engines back toward New Haven [DTR/08/11/1871/02]. The
NRR track is to the right and continues on to go to Seymour and points north. As late as January of 1891, Pres. Stevenson
spoke of extending the NH&D to Seymour by a third crossing of the Naugatuck River here where the newspaper said "extensive side tracks for freight and a new turning table are building"
to accommodate the increased business after the HRR lease [NHER/01/06/1891/01; HRR AR 1890, p.5]. At the height of its succcess,
there was talk of extending the NH&D all the way to Waterbury to compete for the vast amounts of industrial production
the NRR, now leased by the NYNH&H, had always profited from.

|
| Derby Historical Society |

|
| Ansonia Library |
[4.66.1] Two views of the freight house that stood
just east of the 'half-covered' bridge on Bridge St. The original NH&D 1871 freight depot burned in
1885. It was described as a 75x40-ft structure then, with a total loss in the
fire of $5,000. The NH&D was not liable to reimburse assignees for merchandise not picked up within 24 hours of delivery [NHER/06/08/1885/01].
Even prior to the fire, the newspaper said that the NH&D had been in discussion with the NRR about building a joint
freight depot, probably the expansive 1884 structure seen below at MP4.67, but
that the NRR had reneged and the NH&D was going to rebuild on its own, at an expected cost of $1,500 to $2,000. It was close to
completion later in June [NHER/06/26/1885/04]. The old pillar crane stands at the ready. The photo on the right
is described in its attached caption as being at an old mill. We recognized this as the NH&D structure, complete with
another first, an NH&D boxcar lettered 'D.R.R.' on the freight siding. The NH&D had boxcars right
from the start, so this fact is of no help in dating the picture. We think, however, that this is the post-1885
structure with a somewhat different appearance from the 1875 map, including the building's longer eave overhanging the
track on the west side.

|
| Branford Electric Railway Association |
[4.66.2] This is a shot of the Ansonia,
Derby & Birmingham trolley cars on the NH&D freight spur in Ansonia where they were delivered in the fall of 1887. The
pillar crane is seen to the left. The new equipment sits on the flatcars of maker J.G. Brill. By January of 1888 [NHDP/01/07/1888] the
trolley cars were moved to the AD&B facility at Main and Water Sts., near the NRR depots, and the new cars
were reportedly in service on the electric line by April [NHDP/04/25/1888]. The AD&B started as the Derby Horse Railroad
in 1885 and subsequently had its charter amended to allow it to use electricity and to haul freight as well as passengers. For
the former purpose it extended its Main St. Ansonia track down to the dock just below Derby Jct. There it
connected with the new Naugatuck Valley Steamboat Co. formed in conjunction with the electric road. The plan was to take
Ansonia's industrial products directly to New York and utilize electricity to undercut the rates the railroads were
charging. The steam roads did, in fact, cut rates at this time, in response to the AD&B but also due
to changes in railroad managements. The NH&D, now aligned with the HRR, and the NRR, leased by the NYNH&H in
April of 1887, had just cancelled their 1880 freight-pooling agreement in October and began to compete vigorously.
While one might wonder what role the opening of the AD&B played in these events, the negative impact of
the events on the AD&B is certain. Challenged by the increased competition, costly problems with the new technology, and
the failure of its fragile boat connection, the freight operation ceased late in 1889. The historic AD&B electric
freight engine lives today at the Shore Line Trolley Museum run by the Branford Electric Railway Association [click here]. AD&B passenger service endured and was absorbed in 1900 as part of the CR&L operation between New Haven and
Derby that would soon drain riders from the old NH&D line.

|
| TylerCityStation Collection |

|
| Ansonia Library |
[4.67]
The view on the right shows the 1887 passenger station as well as the ca. 1884 freight house. The one on the left is
a post card, probably ca. 1900. The freight house has been noticeably lengthened, perhaps subsequent to the 1887
lease of the NRR by the Consolidated. The NRR track runs behind it. Depending on the date, that track still runs
to Derby Jct. as the former NRR main or it is already cut off near the Ansonia border at Division St.
as it was ca. 1904. It does not seem like the double-tracking, completed by mid-1904 to a mile or so north of Ansonia,
is in yet, but it is hard to tell. This view is from Bridge St. just above the NH&D bridge over the Naugatuck River,
which, since 1880, has been the covered bridge seen in the next photo.

|
| Derby Historical Society |

|
| Ansonia Library |
[4.67.1] In
another rare photograph, we have a view of the covered bridge that the NH&D built in 1880 to replace the wooden truss
bridge seen above at MP 4.65.2. The new bridge had iron support elements and possibly an iron deck as well. The structure,
however, was primarily wooden and thus covered for protection from the elements. Compare this bridge to what is seen on
the bird's-eye map at MP 4.60 for Derby Jct. While we don't have the reference
at the moment, this bridge apparently burned on June 16, 1902 and 70 trains per day were said to be using the NRR's track
on the east side of the Naugatuck River until the bridge was replaced in the 1903 double-tracking. The enlargement
also gives a clear picture of the Birmingham Water Co. dam, which spanned the Naugatuck in two sections and diverted
flow into the canal. Seen in the background is the half-covered Bridge St.
bridge linking east and west Ansonia. The bird's-eye map at left shows
the covered railroad bridge at the red arrow, but the captioning in the Images of America Ansonia
book [p53] from which this was taken ascribes the bridge to the NRR instead of the NH&D.

|
| Connecticut Historical Society |
[4.67.2] This is one more lucky find at CHS. We weren't
sure exactly where it belonged but something told us it was NH&D and we seem to be correct. On the right is the end of
the new steel bridge that was built in 1904 and replaced the NH&D's 1880 covered bridge over the Naugatuck River into
Ansonia [HC/02/03/1904/02]. The elliptical guard rails of the Bridge St. 'half-covered'
bridge are to the left and the end of the covered portion is over to the far left. Construction work on the rail line
is perhaps just finishing up the double-tracking. Note the two Hall 'banjo' signals on the water's edge. We have
a reference somewhere that the 1880 wooden railroad bridge burned in the early 1900s and put all service to and through Ansonia
on the NRR line east of the river. That fact probably made the building of this new rail bridge a higher priority than the
building of the triple bridge at Derby Jct.

|
| Ansonia Library |
[4.68] The locomotive on the right is on the crossover from the Naugatuck track to the
Derby line. This is where NH&D passengers would have boarded to go south to Birmingham, Derby Jct., or all the
way to New Haven. The passenger station is just to the engineer's left. The
large building with the five chimneys behind the engine and partially obscured by its exhaust was known as Terry
Block #2, the structure immediately north of the Ansonia Opera House. This photo probably dates to the 1880s. The
Maple St. bridge is out of sight to the left in the center. The area where the shacks are standing to the engineer's
right would be the site of a new 1903 Ansonia passenger station.

|
| Thomas J. Dodd Research Center, UConn |
[4.69]
This postcard view shows 1903 station at the red arrow, standing north of the 1887 Ansonia station at
the blue arrow. Plans were announced late in 1902 for this structure [ES/10/27/1902/02; ES12/22/1902/03], and it was
almost finished at a cost of $20,000 when the railroad abandoned it. This was due to some dissatisfaction with the location,
possibly exacerbated by basement flooding problems being right next to the river. It reportedly stood unused for 10 years.
If true, it would date the view above from ca. 1903 to ca. 1913. The railroad had reportedly 'confessed' in the
meantime, that the design was meant for Beacon Falls, not Ansonia. [ES/09/06/1955/02]. This was perhaps a feeble
attempt to save face, since a station of this size would probably not have been slated for the smaller manufacturing town
up north. The embarrassment was revisited when the flood of 1955 uncovered the foundation for the 1903 structure. Ironically,
if it had not, the railroad itself might have. It had just announced that it planned to build new passenger and freight
depots north of the existing Ansonia station, probably where the old construction lay buried for half a century [ES/01/19/1955/3,9].

|
| Leroy Roberts Collection |
[4.69.1] The old Ansonia brick water tank that may have dated back to NRR times is shown here in this photo from
November 10, 1916. It stood south of the passenger station and adjacent to the two-story freight office. It seems to be
visible there in the image above at MP 4.69. By the 1920s it appears to have been replaced by a somewhat different (legged?)
structure seen in the map shot at MP 4.70, just below. This older tower is also seen below in the middle photo at MP 4.71
with the water plug it fed standing in front of it.

|
| UConn Libraries |
[4.70] This is from the 1921 Hughes and Bailey map of Ansonia [click
here]. A train is passing the Ansonia station heading for Derby. The station looks pretty
close to the photograph below. The 1903 station, if it were still standing, would be in front of the last passenger car.
Note the two-story office at the north end of the the freight depot just to the engineer's
left. A fire would see the upper story cut off sometime after this, probably in the 1940s [ES/09/23/1955/03].

|
| Ansonia Library |

|
| Richard A. Fleischer Collection |

|
| Photo - A.A. Lawrence Collection, Copyright NHRHTA, used with permission |
[4.71] Three views of the NRR's sturdy brick Ansonia passenger station, that replaced the 1849 wooden combination depot. The growth in
freight business undoubtedly contributed to the need for this. The upper left postcard view is probably around the time the
station opened in 1887 and continued to be used by NH&D passengers as well. The upper right photo shows the double-tracking
in place, hence is late 1904 or thereafter and the abortive 1903 station could be standing out of sight to the left. Note
the pillar crane, the water tower, and the water plug to the right of the station. The lower shot is the station as seen
in 1929. While the building date of this station has been somewhat difficult to clarify, a brief mention found in the
Derby Transcript says that "the last touches are being given to the new depot" early in 1887
[DTR/01/12/1887/03]. George Porter was named NRR agent for the new station and
moved his family from Bridgeport to Ansonia at this time [NHWP/01/20/1887/04]. The two aborted attempts at replacing
this station left it still standing here, looking rather shabby and outdated especially in later years, as seen in the
bottom photo in 1929. It was declared "beyond repair" in its 69th year after the 1955 floods [ES/12/29/1955/09]
and the paper said the "roof was off the old station by noon today" on October 15, 1956 as it was being demolished
[ES/10/15/1956/04].

|
| TylerCityStation Collection |
[4.71.1] Click on thumbnail at left for entire map.
The shot above is from the street map from the Price & Lee Co. 1903 city directory for Ansonia, Derby, Shelton,
and Seymour. The old NH&D freight spur [see MP 4.65] has been extended
below Central St., probably along with the 1903 double-tracking. The new section (red arrows) shows here as reconnecting right at Beaver Brook with the old NRR main that ran along Canal St.
The 1921 bird's eye map obscures the lower connection and it is possible that the river spur just dead-ended
there. The old NRR main would be severed on the north just short of Bridge St. (blue arrow) The crossing there was eliminated
to give a better grade on the new Bridge St. bridge and viaduct over the railroad completed in 1913 or 1914. The green
arrow indicates where the new freight yard would be located ca. 1910 in the flats between the Birmingham canal headwaters
and the west side of the river. The rights and properties of the Birmingham Water Co. were purchased by the NYNH&H in
1910. The dam was to be taken down and the canal was to be filled in to make way for the new freight yard. The dam is
still seen on the map above starting at, and partially covered by, the upper red arrow and crossing the river to meet
the canal intake channel. The enlargement shows this more clearerly. BIF, Sterling, and the Alling Mills were the
major canal customers at the time and, even though it is not stated how this power source was to be replaced, it
was likely by electricity [NHER/05/24/1910/01; HC/05/25/1910/02]. Today's Pershing Drive also runs on some of
the old canal bed.

|
| Ansonia Library |

|
| Ansonia Library |
[4.71.2] These two scenes show the construction of
the new Bridge St. bridge and viaduct over the railroad tracks near the NH&D freight house, which is still standing
here in 1913. In the upper shot, the north corner of the freight house is seen at the right in the photo. We note that
the pillar crane is gone, a sign that perhaps the depot was about to be taken down at this time. In the lower photo, the freight
house is perhaps out of sight to the right or has been demolished. The approach railings to the soon-to-be-taken-down,
'half-covered' bridge are shown with a sign warning drivers to 'hold their horses.'

|
| UConn Libraries |
[4.71.3] This is from the 1921
bird's eye map and shows the S connection allowing access to the old NRR main after it was severed at Bridge St. and could
no longer be accessed there south of the freight house. By now plans for relocating the freight depot down here near
the S had been given up and the railroad was disposing of the land it owned in this area. The new yard is already across
the river between Bridge and Division Sts. in the expansive 'flats' that were built up and regraded
by the railroad.

|
| Copyright NHRHTA, Inc., used with permission |
[4.71.4] This is the north end of the area in the map seen at MP 4.64.2. Scroll over to the right in the enlargement
to see details for Ansonia. Note the double-tracking still in place on the Naugatuck line, the appearance of 'Depot St.'
from Main St. to the north end of the passenger station, and the large width of the old canal tail race which runs under the
freight house. Track detail is also shown for the new freight yard along Mill St. in Ansonia on the west bank of the
Naugatuck River. This started in the 'flats' around Division St on the southern end and tapered back into the
main on the north end prior to the crossing of the river into Ansonia.

|
| Photo - A.A. Lawrence Collection, Copyright NHRHTA, used with permission |

|
| Photo - J.J. Harness Collection. Copyright NHRHTA, used with permission |
[4.72] Two 1927 views
of the block-long 1884 Ansonia freight house. The upper shot is of the north end and shows the two-story office structure.
The lower picture is a NYNH&H valuation photo taken by J.J. Harness on February 6 and looks north from the south
end of the structure. There are Wabash and New Haven boxcars on the siding along the platform. In the left distance
you can just make out the FARR in the Farrel Foundry and Machine Co. sign. Also visible is the train order signal in front
of the passenger station just to the left of the freight office, a horse-drawn wagon in the driveway, and the ventilator
on top of the water tank over the freight house roof. The exterior of the freight house is looking pretty weathered at
this point but the structure would last until the flooding of 1955.

|
| Ansonia Library |
[4.72.1] The end of the Derby road's
line, as mentioned above, was in the heavily industrialized area north of Maple St. that would come to be the home of
this massive complex owned by the Farrel Machine and Foundry Co. The extensive trackage, shown here perhaps ca.
1920, indicate the primary dependence on rail freight service. The tracks are still in the ground today. As Metro-North
rolls through here, staccato horn-blasts for the empty crossings echo eerily off the walls of the buildings that are
mostly vacant.

|
| Leroy Roberts Collection |

|
| Leroy Roberts Collection |
[4.72.2] The Ansonia passenger station and freight house in the mid 1950s, just before
the deluge.

|
| Thomas J. Dodd Research Center, UConn |
[4.72.3] This shows the scene after the flood of August,
1955, the passenger station being at the blue arrow. The freight depot is at the red arrow. The office now
has a single-story, Cape Cod-style profile, after a fire probably in the 1940s. The newspaper reported that the flood
tore the entire depot off the brick piles on which it stood "so that the platform and roof were bent and twisted
like a toy." The railroad lost no time in announcing that the freight depot would not be rebuilt and that operations
were to be moved to Derby [ES/0826/1955/04]. The fact that it sat astride the old tail race, which still served as a channel
for storm runoff, probably did not help with water already rushing under it. The building was cut in half to empty
the tail race which was clogged with debris, the sight of which was described by U.S. Senator Prescott Bush as "the
most horrible thing he has ever seen" [ES/09/06/1955/07]. In addition to the ugliness, the back-up was preventing
streets from draining. Firemen watched over a funeral pyre as the remnants of the structure were burned to clear
the area. [ES/09/20/1955/05; 09/23/1955/03]. Click here for more on the old canal and tail race.
.

|
| Thomas J. Dodd Research Center, UConn |
[4.73] This is a view of the Conn. Co. trolley express depot in 1937. This structure stood off of Main St., below
Central St. The railroad considered moving its freight depot here, buying all the property between Canal
and Main Sts. down to Beaver Brook [ES/08/06/1906/02]. This may have been part of the plan to gain more space for the
station seen below. Rumor even had it that Pres. Mellen was considering tranferring the railroad shops just moved from
New Haven to Readville, Mass. back here [ES/07/04/1904/03; 07/26/1904/03]. Among the reasons cited was worker discontent
with relocation to Readville and the withdrawing of free passes on the railroad for their use in coming back to their homes
in New Haven. The railroad was also said to be dissatisfied with Readville's distant location. It is unclear what
became of those plans as the area is still largely residential on the 1921 map. The view here is to the south with
the trolley spur coming off Main St., which is to the left.

|
| UConn Libraries |
[4.73.1] This is a shot of the Conn. Co. freight house from
the 1921 map. Note the trolley express car parked on the north side of the depot, replicating the scene above. The
dead-end trolley spur appears to be on or just below Cheever St., which was closed west of Main St. on the request of the
company after the property was purchased. According to the 1875 Bailey map, it is the Church of the Assumption on the
corner of Main and Green Sts., whose steeple overshadows the freight house.

|
| Ansonia Sentinel |
[4.74] This sketch appeared
in the The Evening Sentinel on May 12, 1906. It shows the grand station plan for
what was said to be "another new one of greater dimensions" to replace the 1903 station that the
newspaper said was to be pulled down. The dimensions actually were not much larger [HC/07/20/1904/08]. This 125x32-ft
English Renaissance structure was to have a porte cochere, a covered carriage porch, seen above, on the east
side [ES/05/12/1906/01]. By late 1904 the railroad owned all the land west of the old NRR track between Bridge and Maple
Sts. [ES/08/04/1904/03; 08/19/1904/03; 09/15/1904/02; 09/30/1904/04]. This plan was still being spoken of in August of
1906 when more land was obtained below Central St. [ES/08/02/1906/02]. Rumors again came to life in 1908 that work
was starting on the new passenger station, though Charles F. Brooker, last vice president of the just-legally-expired NH&D
as well as an NYNH&H director and resident of Ansonia, said any such report was "news to him" [ES/12/16/1908/05].
By early 1909, the railroad was looking to unload the lower Main St. property and build a new yard below Bridge St. possibly moving the freight depot to the site of the Ansonia Lumber Co. [ES/01/11/1909/02]. This
plan was also abandoned. The new yard was built on the west side of the river between Bridge and Division Sts. and the freight
depot stayed put until it was torn down in 1955. Whether any work was ever begun on the second attempt at a new
passenger station for Ansonia and why it never came to fruition is unclear.

|
| Ansonia Sentinel |

|
| Ansonia Sentinel |
[4.74.1]
Two more illustrations from the Sentinel, also on May
12, 1906. The upper one shows the floor plan and the lower the proposed new layout for the station area. The new station is
between Bank and Water Sts. but considerably closer to Bridge St. and the river. The latter is interesting since one
of the problems with the 1903 station was basement flooding. Nothing is shown at the site of that abandoned station by
the Maple St. bridge. This perhaps indicates that it is either gone or it was no longer worth talking about, surprising
after all the publicity it received. Note the stub-ended track for Derby line trains at the south end of the new station here
and the new approach from Main St. The old freight and passenger depots are in dotted lines indicating their planned
removal, the former down to the areas discussed elsewhere below Bridge and/or Central Sts. The exterior arc lights, noted on the map and already in use on the station
grounds, were fairly common by this time. Back in 1878, William Wallace, another Ansonia metals-industry pioneer,
had demonstrated a dynamo that could power several arc lights of 4,000 candle-power to a visiting Thomas Edison [click
here]. Wallace was one of the industrialists
who backed the AD&B and its use of electricity for locomotive power.

|
| Thomas J. Dodd Research Center, University of Connecticut |

|
| Thomas J. Dodd Research Center, University of Connecticut |
[4.75] Two views of the 1903 single-deck, double-tracked,
double-span bridge that replaced the old NH&D covered bridge across the Naugatuck River coming into Ansonia. It was built by the American Bridge Co. and was being finished as they were starting
the more complex construction on the triple bridges at Derby Jct. [ES/12/09/1903/09]. Progress on the latter was delayed by
strikes and friction between union and non-union iron workers [HC/05/18/1904/12] that came to the point of an unsuccessful
attempt to dynamite the Ansonia bridge [HC/02/12/1904/01; 02/16/1904/08]. The upper view shows the line submerged
on the southern end below Bridge St. in one of the floods of 1955. The large manufacturing facility on the east bank of the
river is Ansonia Brass and Copper Co., locally known as A.B.&C., the later evolution of the companies
Anson Phelps founded. The lower view is of workers surveying the damage to the approach to the railroad bridge. Judging
from the elevation and the structure on the shore in the left background, this seems to be the north end. All of
the 1900s-era iron structures in the lower Valley held their positions pretty well in the face of the ravaging waters.

|
| TylerCityStation Collection |
[4.75.1]
A few ties remained even in 1980 along the original NRR right of way in Ansonia. This is somewhere between Division and Bridge
Sts. on the east side of the Naugatuck River.

|
| Thomas J. Dodd Research Center, UConn |
[4.76] The end of the line, in more ways than one. Ansonia was
the terminus for the NH&D on its own, as well as when it was part of the HRR. As genuine as the promises
of new facilities might have been, and as unrealistic as well, Ansonia was never to have a station again. The shelter
seen here was the only thing built after the flood, in spite of the protests of the mayor and chamber of commerce against
what was called a "fourth rate shed" [ES/02/20/1956/04]. The mayor complained that the railroad had received $10M,
presumably from the federal government, to restore facilties to their pre-flood condition, apparently to no avail [ES/02/18/1956/02].
All those years of railroad service from the NRR, the NH&D, the HRR, and the NYNH&HRR, were reduced to this.
Sic transit gloria mundi. At least the Metro-North Waterbury branch today is seeing something of a revival with more
trains due to high gasoline prices and a rise in commuter use. The continuance of service has otherwise been something
of a battle at times.
Click
here to go to Track 5 and ride the NH&D's 1888 Extension from Derby Jct. to Botsford!
|