Take a ride on the
Extension, Derby Jct. to Botsford!
[5.1] The Extension opened for service late in 1888. This westward
linkage of the NH&D in corporate form went back to October 21, 1882 when the articles of association for the Housatonic
Valley RR were filed with the Connecticut secretary of the state [CRC34.1886.5]. This project was backed by the New York
and New England RR, which purchased it and gave it to the HRR to build. The HRR was limited by its charter to branches
of less than 10 miles, so it was to construct only 9.79 miles down from Botsford to meet its leased NH&D which
was building the rest, some 3.79 miles up from Hog Island, just across the Naugatuck River from Derby Jct. The purpose
of this branch was to enable the NY&NE, and the HRR it controlled at the time, to enter New Haven to better compete
with the NYNH&H. The layout of the Extension was approved by the railroad commissioners on February 6, 1888 [CRC 36.1888.14].
It was three-quarters graded, the first mile of track south of Botsford was in place, and two-thirds of the pilings for
the trestle crossing of the Housatonic River were done by July of 1888 [NHER/07/06/1888/01], with estimates of 800 to 1,000
men or more on the job. This was difficult work once the line left the river, with mountainous terrain to conquer,
surprisingly just 20 miles from New Haven. Considerable trestlework, expecially near Zoar Bridge, was necessary. The work was made somewhat easier when the railroad engineers found "the remains of the military road made for the transportation of the French artillery" in Rochambeau's Revolutionary
War march to New York in 1781 [Sher, p.12; click here also and see p. 36]. Public excitement over this ambitious project led to a spirited real estate
auction held in Birmingham where 2,000 people bid on lots expected to increase in value with the coming of the Extension
[NHER/05/23/1888/02]. In fact the NH&D completed about 7.5 miles of track to their station 402 below
the Round Hill trestle, stopping on October 4 with the HRR crew 1500 feet away [HC/10/08/1888/06]. A gala gold- and silver-spike
ceremony marked the completion festivities on October 17, 1888 about a mile below Zoar Bridge [See Track 6, MP 6.5.2 for more].
The opening was the fulfillment of the NH&D's promise from the start to be the 'Gateway to the West'
for New Haven, a compass direction that its other railroads never adequately addressed. This was not only a banner day for
the Elm City, but also for the town of Huntington's Shelton borough, booming with industry and in need of direct
rail service. The commissioners certified the line as safe for public use on November 14, 1888 [CRC36.1888.14]. The first
regular train on the Extension ran on November 26, 1888, some 20 minutes late because of storms and track damage
the previous evening. About 20 people rode in a consist of four cars, three passenger and one baggage and, in spite of
the lingering bad weather, onlookers came out to cheer the maiden run [NHER/11/26/1888/03]. A Register
article [NHER/10/16/1888/01], which appears to be a reporter's account before the official opening,
provides much of the detail below.

|
| Library of Congress |
[5.2] Our reporter says the Extension
started "a few feet from the junction of the Naugatuck and Derby railroads" at Derby Jct. (lower left) and
ran 2,000 feet before diverging on Hog Island toward Shelton via (O')Sullivan's Island. The next 2800 feet was first said to be all 'spile' trestlework and was dubbed the 'Starbuck piling'
for the HRR president. The implication of an extra track right from Derby Jct. has to be discounted because the 1880
covered bridge was built only for a single track and this bridge was not replaced
until 1904 with the double-tracking by the Consolidated. For a full view of the 1898 map above, click here. The Housatonic islands still seen here would be connected later to the Derby mainland by natural silting and the deliberate
filling in of the flats.

|
| Shelton Historical Society |
[5.2.1] Captured
here in this unique and priceless photograph is the replacement of some of the trestlework with the first iron span over the
Housatonic River going into Shelton, which is to the left. Our reporter says that work on the coffer dam for the
first pier for the iron bridge was in progress in October of 1888 even before the opening of the Extension and that it would
take a year to complete all the work. The erection of the bridge appears to have taken place in 1890, when a newspaper
article said that the new iron bridge was being installed. It was described as a steel-riveted, lattice span, 156 feet
in length, 28 feet in height, 16 feet in width, and 14 feet in clearance
over the river, needing 5,000 rivets to assemble it [HC/05/27/1890/06]. The completion was mentioned at the end of 1890 in the HRR annual report for
that year [p. 4]. This photo appears in the Images of Shelton book [p. 41] with a date of 1888, which appears to be in error. The second
span promised by Pres. Starbuck, for less obstruction to navigation and more protection from ice damage in the winter, was
not put in at this time [NHER/07/18/1888/01].
|

|

|

|

|

|

|

|

|

|

|

|

|

|

|

|

|
| Courtesy of Scientific American |

|
| Derby Historical Society |
[5.3.0] The price of delaying the second span was perhaps paid when the
most serious winter freshets in a generation started the Housatonic River rising from January 11 to 28, 1891, and on
the latter date breached the Ousatonic Water Co. dam. This sent chunks of ice downstream, mounting
to 12 feet in spots and devastated the frail railroad line across the river [CRC39.1891.14;
NHER/07/18/1888/01, 02/24/1890/02, 01/17/1891/01, 1/23/1891/01]. The damage is seen in these three
images. If you look closely at the single photo, you can see the single iron span on the right, which is the Shelton side.
The paired images are engravings that appeared in Scientific American [03/21/1891/183].
They were made from photographs that were reportedly taken within a few hours of the destruction. The view in these images
is looking toward Birmingham where the easterly stone pier has sunk noticeably, it being the one closest to the middle of
the river. The one in the similar position would give out again in 1983. It was estimated that this damage would cost the
railroad $50,000, plus the loss of business, though elsewhere we have read that merchandise was to be carted across
the Huntington bridge between Birmingham and Shelton to keep the freight moving. Passengers could board and
disembark at those stations as well.

|
| TCS Collection |
[5.3.1] The second span was not put in until the Consolidated did it late in 1892. It was duly noted by the
railroad commissioners in the first of their twice-annual inspections in 1893 [NHER/10/15/1892/01; NHER/06/10/1893/03].
That would date the postcard view above to sometime between late 1892 and 1905 when work started on the replacement
of this bridge with the double-tracked span. Visible in the distance over the trestlework on the left may be the covered
bridge from Derby Jct. to Birmingham, which would not be replaced until 1904.

|
| Library of Congress |
[5.3.2] This shot is from a 1919 aerial view of Shelton.
Click here for the entire Hughes and Bailey map. The blue arrow points to the now three-span,
double-tracked bridge over the Housatonic River that the NYNH&H installed. Plans were
first mentioned in the newspaper in August, 1904. The article said it was to be 450 feet in length, comprised of three
150-ft spans. Within the width, the two tracks were to be laid on 13-ft centers, in anticipation of larger freight car
dimensions. The railroad had reportedly adopted this new standard in April of 1903 [ES/08/24/1904/07]. Construction
of the new bridge was under way in 1905 [CRC53.1905. 26] and it was finished
by June of the next year [NHAR35.1906.5; CRC54.1906.241]. It is unclear whether the old piers were broadened or completely
new ones built for the wider bridge. The yellow arrow points to the Bridge St. viaduct over the railroad with
the new concrete arch bridge to Derby, built in 1918, at the lower right. The green arrow points to the passenger
station and the red arrow points to the freight station.

|
| TylerCityStation Collection |

|
| TylerCityStation Collection |
[5.3.3] These two photos are from
1980 when we were chasing a Conrail freight working in this area and presumably heading for Danbury on the Extension. The
location of the upper photo has been clarified by a TCS visitor as being at the floodgate, seen on the right ahead of the
engine, on the eastern bank of the Housatonic River, with the raised barrier to form the seal visible on the ground.
The Route 8 overpass is in the background and, if this picture were taken today, the Derby Greenway would be overhead just
at the point from which this picture was taken. In the lower shot, our consist is just beyond the floodgate
and about to cross the river on the 1906 bridge.

|
| TylerCityStation Collection |

|
| Photo - Copyright John Babina Jr. 2008 all rights reserved |
[5.4] The photo on the left is from 1980 and the
other is from 2008. Two of the old stone piers, probably from 1905-1906, still
support the bridge today. The one closest to Derby sank into the river in March of 1983 after heavy
rains and was replaced with the concrete one seen here [ES/03/22/1983/01]. The double-tracking of
the Berkshire division from Derby Jct. was approved by the directors late in 1909 [NHER/12/13/1909/01]. Long passing sidings
were already in place on the Extension as the last portion of the new double-tracked freight line to the west
was about to be completed. As far away as Minnesota, the Duluth News-Tribune was reporting [03/19/1905/2:7]
that the "rural wilderness" of Maybrook [N.Y.] was being developed into a "New Gateway to New
England" to avoid the "choked knothole" of New York City. After a more than a half-century of service,
the second track was reduced once again to passing sidings by 1961 [DLNH: 66] due to falling freight volumes, retrenchment,
and bankruptcy. A newspaper article [HC/07/29/1959/23] said in July of 1959 that the railroad had removed the second
track from Poughkeepsie to Maybrook and put that section under centralized traffic control (CTC) that was to be governed from
Danbury. Powered switches were set to have eastbound trains take the sidings with spring switches allowing
them to regain the main along the 98-mile route. The Derby to Danbury portion was to be finished by the end of 1959
and the remainder to Poughkeepsie thereafter. It was expected to recoup "a large share" of the $920,000 cost from
the sale of the scrap rail. Operating efficiencies and lower track-maintenance costs were also cited in favor of
the plan.

|
| Photo by J.W. Swanberg |

|
| Photo by J.W. Swanberg |

|
| Photo by J.W. Swanberg |
[5.4.1] These photos were taken by Jack Swanberg on July
23, 1983 after the bridge collapse mentioned above and we have reprinted them with his gracious permission. We did
the best we could, scanning them at 300dpi from the Shoreliner [15.4.30+ (1984)]. They accompanied an article entitled
"My Bridge," by Jim Minor, an NHRR operator and dispatcher. We found this and many other forgotten pieces in
a recent revisiting of the 30 years of issues we have collected. Jim's article was nicely written and enthusiastically
recalled the glory days of 'his' bridge and the Maybrook line. We may not actually be able go back, but
at least we can revisit those good old days in our Shoreliners!

|
| Copyright NHRHTA, used with permission |
[5.5]
This shot is approaching the Shelton stop. The scene is under the Bridge St. viaduct which the railroad put in
shortly after opening of the Extension at its own expense. Our reporter tells us that "several car loads of the iron sections" were on a side track at Derby Jct. when
he rode the line in October of 1888 and another front page article tells us that work was resuming on the viaduct after
a "difficulty" had been resolved [NHER/10/16/1888/01]. The difficulty
may have been any of several issues including local fear of the narrowing of Canal St. where the track was to be
laid, a too narrow width for the viaduct bridge, and, the desire of some that solid fill with a smaller
bridge be installed instead of the viaduct, perhaps fearing the possibility of collapse. [NHER/05/15/1888/02; 08/11/1888/01]. These objections, perhaps surprising for a community that had been complaining about
the lack of a railroad for years, almost caused the line to take the easier-to-build but less direct, alternative
route up the east side of the Housatonic to Bennett's Bridge to meet the NY&NE there [NHER/11/18/1884/01;
04/04/1887/01; 05/15/1888/02; 05/16/1888/02 08/02/1888/02; 08/11/1888/01]. Our engine, the NH&D #33, is headed toward
Botsford. The black-and-white photos with this engine were reportedly taken by Charles Rufus Harte, chief engineer
for the Connecticut Co. through most of its existence. The build date for #33 was April 8, 1889 and it was
probably delivered by May. Obviously then the viaduct was up by that time. If
Harte was responsible for these shots, he wasn't the only photographer to be chasing this train. See MP 5.14.1 where we
have put a photo attributed to Charles Nason. The only reason we can think of for all this publicity was to capture
the first run of the #33.

|
| Shelton Historical Society |
[5.5.1] This is a shot of the viaduct bridge over the
Extension in Shelton. The view looks toward Birmingham and you can see the 1857 Huntington covered bridge over the Housatonic
River in the lower right. The entire roadway from that bridge almost back to Howe Ave. was raised to provide enough
clearance over the tracks. This photo dates to between early 1889, when the viaduct was probably finished,
and 1891 when the covered bridge was replaced by an open, iron structure. This photo also appears in the Images of Shelton book on p. 41. The interesting
type of bridge construction for the viaduct is called a parabolic or a lenticular truss, the latter for the
lens-like curve of the top and bottom chords. Connecticut's own Berlin Iron Bridge Co. patented a type of bridge
like this, usually made of wrought iron, and likely built this one, though no direct attribution has been found yet. Click
here and here. The viaduct figured in a later legal battle when, based on the fact that the HRR/NH&D
installed it, the Consolidated claimed, futilely, that it was privately owned and that the Shelton Street Railway could not
lay its track across it to get to Birmingham [NYT/05/05/1896/02]. Ironically, in light of the fears of 1888, this viaduct was
said to have 'collapsed' in 1950 after a heavy cement truck passed over it. Shelton's Mayor Lemay sent
a telegram to NYNH&H Pres. Dumaine demanding that the "antiquated" viaduct be replaced immediately [NYT/10/25/1950/10]. Apparently
the old viaduct was not so seriously damaged that it couldn't be repaired. It was not replaced until 1973 with the present Veteran's Memorial Bridge.

|
| TylerCityStation Collection |
[5.6] This postcard view shows
the Shelton passenger station to the left with the two-story freight station farther down the track. Note the tracks on the
north side of the Ousatonic Water Co. This siding was probably the one "along
and across Canal St." that was requested for switching purposes by the water company, which owned most of the land
along the canal, in a hearing on April 10, 1906. It was approved by the railroad commissioners on April 26 [CRC (1906) 54: 8].
The siding ran from a connection above the freight depot at Brook St. all the
way down to end at Wharf St. beyond the railroad bridge from Birmingham. The canal was fed by the company's upstream
dam, which was built in 1870. With the harnessing of this water power, industry in Shelton boomed and resulted in the
changing of the name of the entire town from Huntington to Shelton in 1919 to reflect the importance of the central borough.


|
| Dodd Center, UConn |
[5.7] Shelton station. The photo
on the left appeared in the Illustrated Review
of the Naugatuck Valley [p41]. The 1891 publication date is interesting because the picture is captioned as being the
design of the proposed the depot at Shelton. Not a whole lot of detail can be seen but the finials, the twin chimneys, and
the gingerbread trim that is faintly discernible seem to resemble HRR wooden structures of the period like DANBURY4 and NEW
MILFORD2 [see D, N stations]. As fate would have it, this depot would never be built because by July of 1892 the NYNH&H
would lease the HRR/NH&D and build a brick depot in its own style here, costing about $5,000. Newspaper articles reveal that the basement room in an adjacent house
that had been used as a station since 1888 was abandoned in October of 1892 with the opening of the structure seen on the
right [NHER/08/16/1889/03; NHER/10/15/1892/01]. That
photo was taken on September 24, 1930. Passenger service had already ended on the Extension by this time and the station in
Derby was renamed Derby-Shelton to reflect the change. See S stations on Track 16 for additional views of SHELTON2.

|
| Thomas J. Dodd Research Center, UConn |
[5.8] This train is not the
one seen above. This is a Sunday school picnic special at Shelton station. The freight house, with the ornate window
in the gable is up where the engine has stopped. Perhaps this is the St. Mary's
group from Derby that had a picnic excursion of some 13 carloads going to Parlor Rock, the HRR's popular park
and grove in Trumbull, in August of 1889 [NHER/08/20/1889/03]. With the Extension and the wye at Botsford in
place, this was now ever so much more accessible by rail from here. Click here for more on Parlor Rock and see also P stations on Track 16.

|
| TylerCityStation Collection |
[5.8.1] A ca.
1980 shot of the vacant area where the Shelton station once stood. White St., which once served as the station approach, comes
down the incline from Howe Avenue.

|
| Photo - Copyright John Babina Jr. 2004 all rights reserved |
[5.9]
Jumping ahead a century, the Providence and Worcester RR is shown here operating to Danbury over the
Extension in 2004. Here the P&W gravel train passes through Shelton. It appears to be just beyond the site
of the old Shelton passenger and freight stations. Note the rails from an abandoned siding sticking out of the pavement on
the lower right of the photo.

|
| Photo - Copyright John Babina Jr. 2007 all rights reserved |
[5.10]
This is a recent view from just above the Shelton station location
and just ahead of the P&W consist in the picture above. The shot looks across the old canal toward some of the vestiges
of the great age of manufacturing, now mostly gone. The canal itself has been the subject of some controversy recently due
to land development plans. Click here for more information about the canal and the nearby area.
|

|

|

|

|

|

|

|

|

|

|

|

|

|

|

|

|
| Courtesy of Scientific American |

|
| Courtesy of Scientific American |
[5.10.1] The Ousatonic Dam and the canals
on both sides of the river were finished on October 5, 1870 after three years of work. Locks on the Shelton
canal allowed barge navigation around the dam and gatehouses on both sides of the dam controlled the respective
water flows into the canals. An additional benefit from the dam was Lake Housatonic, which was formed behind it and offered all-season
recreational opportunities on the river. Winter trotting races on the ice were sponsored by the Derby Driving Association,
the same group that ran the racing park on the Naugatuck River flats between Birmingham and Ansonia, when water levels permitted
[NHER/02/13/1884/01]. These two engravings are from the same issue of Scientific
American [03/21/1891/182] as seen at MP 5.3.0. The lower one shows the break of January 28, 1891. Damaged was done
to the gates and abutments on either end as well as 125 feet of the dam's 637-foot length. Click here for what seems to be another view of the damage, though the online caption says
the photo dates to ca. 1894. Work to rebuild the dam was begun
in March and finished in late October of 1891. The new design used a sloping apron instead of the old straight-fall style
that helped to undermine the foundation.

|
| TCS Collection |
[5.10.2] A current view of the Ousatonic Dam from the Derby side of the river. The gatehouse is still standing and
just out of sight to the right. The water in the foreground is the canal on the Derby side of the Housatonic River. While
much shorter than its mile-long counterpart on the Shelton side, it did spawn some industry here as well.

[5.10.3]
This is a shot from the southwest portion of the 1893 Derby quadrangle topographic map. Click here for the entire map that covers most of the Extension. The lower arrow points to the
Ousatonic Water Co. dam which began in 1870 to feed the canal that powered Shelton's great industrial transformation.
A canal on the Derby side was also built but was much less successful. The Derby border is the dashed line meeting the river
on the east side. The upper arrow shows Indian Hill Creek and the area seen in the next two photographs.

|
| TCS Collection |
[5.11] Idyllic postcard view
along the Housatonic River looking south toward Shelton. The culvert in the distance may well be where Indian Hill
Creek empties into the river. The structure seen in the next photo does not appear
here, but there seems to be the outline of a foundation just above the culvert and east of the track on the postcard.

|
| Thomas J. Dodd Research Center, UConn |
[5.12]
This is a shot of the Indian Hill Creek culvert with our 1889 consist heading toward Botsford. That would identify the
water in the picture on the engineer's left (west) as the creek. The article says:
"Opposite the old Indian mill is a solid granite culvert in the embankment, through which a little stream flows into
the Housatonic..." The river then is just out of sight on the engineer's right (east). The structure must
be the mill and the culvert probably of granite, as the reporter describes. Today's Indian Well State Park encompasses
most of this area.

|
| TylerCityStation Collection |
[5.12.1] We noted the placement of this culvert back
in 1980 as pretty close to 3.79 miles from Derby Jct. and symbolically marking the limit of the NH&D. In fact, the
NH&D construction crew built well beyond here to meet the HRR at the Round Hill trestle. This point is just above
the line marking the Derby border across the river, as seen on the topographical map at MP 5.10.3.

|
| Walter Fogg Collection |
[5.13]
Clickable photo. The Extension now begins to take on the characteristics of an 'air line' as opposed
to the previous river-line portion. The reporter says that a 1% grade started
at Burritt's Pond on the Huntington-Monroe line and that heavy rock cuttings, as well as curves of 8 and 9 degrees,
begin to appear here. NH&D #34 was derailed and seriously damaged in one of these
rock cuts when it struck a 6-ton boulder in October, 1889 [HDC/10/29 1889/06]. Our train seems to have just emerged
from one such curve and rock cut. NH&D #33 poses here as it approaches the first of two major trestles, the one at Round
Hill.

|
| Walter Fogg Collection |
[5.14]
As with most railroads of the time, these spindly wooden trestles were
subsequently covered with carloads of earthen and rock fill until the tracks were on solid ground. Our reporter tells us that the Round Hill trestle was 380 feet long and 43 feet high and the intention was to fill
it in the coming winter (1889) with the 70,000 cubic feet of gravel that it would require. This side view of the trestle
looks east with the Housatonic River in the background.

[5.14.1] There apparently was more than one photographer for this run, which has made
us think that this was a special occasion of some kind, perhaps the inaugural run of the #33 some time just after its arrival
in May of 1889. This picture was taken by Charles Nason at the foot of the Round Hill trestle as our consist is pulling out
overhead. This image appeared in a 'Vintage Connecticut 1986' calendar with the captioning that it was an albumen
photograph, negative no. 514. If this classic historical image doesn't
capture the excitement and beauty of railroading on the Extension, we don't know what does!

|
| Walter Fogg Collection |
[5.15]
Our train is mid-trestle. We
have recently noted a banner on the rear car, probably proclaiming the occasion of the trip. Alas, we cannot read it.
Round Hill is opposite where the Stevenson Dam would be built. The reporter mentions
the 26-ft tall culvert here that he says was in the center of the Round Hill trestle to allow the Boys Half Way River to pass
into the Housatonic, now Lake Zoar. This oversized culvert is still in use today and visible on the west side of Rte.
34 above the dam. The trestle was the scene of a collision in 1890 between
an eastbound Botsford freight, which had stopped for coal at the siding here, and a freight from Wilson Point which struck
it in the rear [NHER/10/22/1890/01].

[5.15.1] Another shot from the 1893 topographic map covering the
upper Housatonic River portion of the Extension. The Round Hill trestle site is marked by the lower arrow. Our reporter
calls the 1175-ft distance approaching the trestle a "Horse Shoe curve... not as sharp as the famous one in Pennsylvania" on
the high ridge. This can be seen on the topographic map. Note the 'doomed' villages of Riverside and Zoar Bridge on
the eastern side of the river that would be lost to the waters of Lake Zoar in 1919. The upper arrow points to the Bostwick
trestle, noted farther on.

|
| Richard Fleischer Collection |
[5.15.2] This shot of the Federal Express is from the February, 1925 issue of the NHRR publication Along
the Line. The location is identified as Shirt Tail Bend at Stevenson, Connecticut. This fabled train had several
routings between Boston and Washington, D.C. from its inception as the NY&NE's Washington Night Express to
take crowds to the 1876 Centennial celebration in Philadelphia. The use of the steamer Maryland to transfer
this train around Manhattan was suddenly discontinued as of October 19, 1912, due largely to stiffer federal safety
laws governing such transport. This was, of course, just after the sinking of the Titanic on on April 15, 1912.
On Monday, October 21, the Federal began leaving the Shore Line at Devon to use the Poughkeepsie Bridge to cross
the Hudson River. This shot appears to be the eastbound consist sometime between that date and January 9, 1916, when the train
was completely withdrawn due to the unpopularity of this route "around by way of Danbury and the wilds of unexplored
New Jersey and Pennsylvania" [HC/01/07/1916/08]. The train was restored on April 1, 1917 via New York City
with the opening of the Hell Gate Bridge.

|
| Leroy Beaujon Collection. Copyright NHRHTA |
[5.15.3]
We are grateful to Lee Beaujon for permission to use this great photo he took at Stevenson in the mid-1940s. It shows a New Haven 3200 2-10-2 on a westbound freight roaring around Shirt Tail Bend with what appears to be a load
of empty hoppers headed back to Maybrook and the coalfields of Pennsylvania. If the eastbound Federal in the
shot above was running at the same time, the meet would have been in this exact spot. The Arranged Freight Train Service
books that Richard Fleischer kindly consulted for us show six symbol freights running in 1922 and eleven in 1954, plus extras.
There was presumably much more traffic passing here in the mid-1940s with the war in progress.

|
| TCS Collection |

|
| TCS Collection |
[5.15.4] The upper photo is of the
Round Hill trestle culvert as seen from Rte. 34 and shows the 26-ft height the reporter mentioned. The original brickwork is
somewhat obscured by the later concrete buttressing, which included the middle support brace. The back view from Cottage
St., reached by driving up to Stevenson and coming down behind the line, is more interesting and shows a much
shallower height for the culvert on that side. You can see the concrete brace through the arch. The keystone, not decipherable
here, appears to read "Wm(?) Kelley Builder 1888." Numerous contractors worked on the Extension and this Kelley
is not mentioned elsewhere that we have found.

|
| Thomas J. Dodd Research Center, UConn |
[5.16] The railroad commissioners reported [RRC40.1892.14] that "the two temporary trestles near Botsford have been
filled," possibly meaning the one here at Round Hill and the Bostwick trestle coming up. They may have also been
referring to other smaller trestles that they said they had warned previously were not intended to be permanent [NHER/10/22/1891/04]. If
so, then the fill dates for these have not yet been found. Whenever this one was filled in, the
track today stands even as it did in 1888 high above the level of the dam, which was not completed until 1919. Lake
Zoar, behind the dam was was created as a result of the Connecticut Light and Power Co. hydroelectric project. Notice the
young trespasser on the right in this photo.
|

|

|

|
|

|
| Thomas J. Dodd Research Center, UConn |

[5.17] This is the original Stevenson
station, which also served as a dwelling for the station agent, and was apparently
operational by late 1889 [NHER/11/18/1889/01]. It appears to be on the north side of the track. This station burned on May 19, 1905. According to an article in the Stamford Daily Advocate of that
day, a 2:00am down train spotted the flames and blew its whistle to alert the area, but the responders were unable to
save the building. Other interesting detail is that the HRR was going to put a smaller depot here but "four well-to-do
residents of this place," R.S. Hinman, Charles Gilbert, Walter H. Bradley, and a Miss Stevenson [relation to Wm. H.?],
formed the Stevenson Station Co., which built and owned the structure, part of which was used as a store. Agent
Goulette had just moved a piano and some furniture into the structure, intending to make it a residence for his family, when
it burned. He lost his possessions which included 30 bushels of potatoes in the cellar. Neither he nor the station
company had insurance for a loss he valued at $2,000. This area is opposite what was the village of Zoar Bridge on the
Oxford side of the river. The namesake suspension structure [click here] crossing the river way down below behind the station was removed
in 1919 when the Stevenson Dam and roadway across the river there was opened.

|
| NHRHTA Collection |
[5.17.1] Thanks to the research and collections of the late Charlie Grabert, we have this priceless
photo of No. 33 at what looks to be the Stevenson station. Conductor Beers is on the ground and, based on other period photos,
the engineer looks like Tom Quinn and the fireman Harry Merwin. See Track 4A,, MP 4.18 and 4.18.1. The date has to be between late 1889 when this station opened and late 1892 when the NYNH&H then owned
the property and the NH&D/HRR locomotives. Charlie, with whom we worked on his HRR project and our NH&D project, has
also left behind a manuscript history of the HRR, something which may serve as the starting point of a long overdue, complete
history of this Connecticut railroad, one of the earliest in the state.

[5.18] The dynamic William
H. Stevenson, vice president and general manager of the HRR and president of the NH&D, was the moving force behind the
Extension. Locals grateful for the railroad he built thought that his name was the most appropriate for the station here.
A nearby Stephens farm, used to denote the area, made the naming doubly appropriate.
The golden-spike ceremony, as our reporter calls it, [See Track 6, MP 6.5.2] appears to have been just south of
here at survey station 290, which was 29,000 feet or 5.5 miles from Botsford.

|
| Yale University |

[5.19] This
photo has been reprinted in various places and purports to show conventioneers in the Gay Nineties riding the NH&D. This
photo has been located in an online collection from Yale [click here], described as "New Haven and Derby Coach -- with Camera Fan Excursion Prior
to the Gay Nineties." Matched with a newspaper article we have found, this seems to be a picture of the Hartford
Camera Club plus members of other clubs, some 70 people in all, on a free trip up the recently completed Extension,
compliments of Pres. Stevenson, on May 30, 1889. Unfortunately, "the heavy atmosphere was unfavorable for photography,"
but the guests enjoyed time at Indian Well, Round Hill, and had a "bountiful lunch," appropriately enough, at Stevenson's
(sic). If you look closely at the blow-up to the right, you can see 'New
Haven and Derby' inscribed on the ceiling behind the chandelier. [REF: HC/05/30/1889/08].

|
| Thomas J. Dodd Research Center, UConn |
[5.19.1] This is the second Stevenson station. It has been said that this was built as the Monroe station on Hammertown
Rd and moved here in 1905 after the first Stevenson station burned. We are inclined to doubt that. See MP 5.22.3 below
for further discussion. This picture may have been taken just after this depot was put up since it lacks the semaphore pole
seen in the next photo.

|
| TCS Collection |
[5.20] A close-up view of the second Stevenson station. Note the American
Railway Express sign to the left of the entrance. This station was reportedly razed by the NYNH&H in 1938. Rail passenger
service probably ended on the Extension like it did on the rest of the NH&D in 1925. Service in 1937 was via motor coach.
|

|
|

|
| Courtesy of John Babina, Jr. |
[5.20.1] This photo indicates
that it was from the files of Charles B. Gunn, who is best known as the official NYNH&HRR company photographer during
the years of the Patrick B. McGinnis presidency of 1954 to 1956. It is not known whether this was a photograph he took or
merely one in his collection, most of which is in the hands of the Dodd Research Center at UConn. Click here.

|
| Thomas J. Dodd Research Center, UConn |
[5.21] This is the trestle over the road to Zoar Bridge, today
Monroe Tpke. and Rte. 111, just before it meets and ends at Rte. 34. It was known
to the railroad as the Bostwick trestle, named for the president of the NY&NE. It was the biggest construction project
on the Extension. The double-decked span was 700 feet long and 63 feet deep at the center, according to our reporter.
It was also filled in later and an iron bridge installed over the roadway. This view is looking northwest,
more or less toward Botsford.

|
| Photo - Copyright NHRHTA, Inc., used with permission |
[5.22] This is a view of the Bostwick trestle at Stevenson looking eastward. The train is heading toward
Derby Jct. and about to pass by the Stevenson station. Evidence, coincidental or not of New York and New England RR and its
connection to the Extension, is seen here. The famous Maltese cross insignia is on the second boxcar behind the engine. An
article in the Newtown Bee relayed from the New Haven Register reported that a contract for the building
of a culvert at the Stevenson viaduct had been awarded to Foley & Coughlan of Roxbury, Mass. [NB/04/25/1902/01].This was
to allow a tributary of the Halfway River below to flow through once the trestle was filled. The trestle dimensions were given
as 1,000 feet long and 70 feet deep and would require 75,000 cubic yards of fill to be dumped from cars above. The article
goes on to say that this "viaduct has always been one of the points of interest on the Botsford extension, so-called."

|
| TCS Collection |
[5.22.1] This is an eastward-looking
view on March 21, 2009 of the bridge over Monroe Tpke, Rte. 111, just before it ends at Rte. 34 seen in the
distance. Note that the railroad overpass bridge is single-tracked by now with newer concrete abutments. This downsizing
and refurbishment was probably done when the highway was upgraded.

|
| USGS Topographic Maps |
[5.22.2]
This shows the location of the Monroe station on Hammertown Rd. at the upward arrow. A Register article
ran on the day the location was to be decided upon at a meeting between Pres. Stevenson, Supt. Hopson, and the Monroe
selectmen [NHER/11/20/1889/02]. The station was built in 1890 [HRR AR 1890, p.5], and moved to Stevenson, exactly three
rail-miles away, in 1905. Whatever was used in lieu of a station here, this was still a Monroe stop thereafter. This
was also the location of a spur track ran to a short-lived, possibly fraudulent, copper-smelting operation. In 1894, the railroad commissioners approved a two-track spur crossing the highway near
the station to reach the Fairfield Copper Co. [CRC42.1894.34]. The other arrows points to the railroad's High Rock
Rd. bridge, seen at MP 5.23 and 5.23.01.

|
| Leroy Roberts Collection |
[5.22.3] This is the petite station that the HRR put up for Monroe just off Hammertown Rd.,
near where the arrow points on the map above. We had heard that this station was later moved to serve as STEVENSON2 but no
photos showing this small depot standing there have been found yet. In fact, we recall being told by locals that this building
wound up either as a Subway sandwich shop or as part of the former post office there. A current photo of the area shows
those old buildings vacated but still standing. Input from a new contributor clarifies that the post office was built for
that purpose and the other building, originally known as the Little White Inn, appears to be much larger than the Monroe flag
station structure. [rev8/5]

|
| TCS Collection |
[5.22.4] This attractive culvert stands just north of Hammertown
Rd. near the site of the Monroe station. This is for yet another tributary of the Halfway River, whose valley the railroad
followed, to pass under the right of way, as it did several times on the route to Botsford. A concrete upper wall was grafted
onto the original stonework, probably with the double-tracking ca. 1912.

|
| TCS Collection |
[5.22.5] The next crossing
is on Bagburn Hill Rd. Two decks still remain from the era of the double track. Note the sign on the right by a graduate
of the Noah Webster school of spelling!

|
| TCS Collection |
[5.22.6] The probable site
of the Monroe station on Hammertown road is up ahead on the property of the Fairfield County Protective Association.
|

|
|

|
| Thomas J. Dodd Research Center, UConn |

[5.23]
If any photograph captures the nostalgia of railroading in the late 1800s, it is the one on the left, the fleeting
image of a train crossing over High Rock Rd. in Monroe on the Newtown line, with its wooden passenger coaches swaying and
the engine boiler outlined against the evening sky. This unique, high bridge with the narrow roadway below is unchanged today.
Our sense is that this train is heading toward Derby Jct. and is about to arrive at
the the Monroe station. A later shot shows the bridge looking like it
is after the double-tracking ca. 1910.

|
| TCS Collection |

|
| TCS Collection |
[5.23.01] Two northward views
of the High Rock Rd. overpass in Monroe, location that is virtually on the Newtown line. These shots were taken in March
of 2009. The Monroe station site, which is on Hammertown Rd., is a short distance down the track to the photographer's
right.

|
| USGS Topographic Maps |
[5.23.1] This snippet is from the southeastern portion of the
1892 Danbury quadrangle. Click here. The Botsford station was the end of the line for the Extension and for the New Haven
and Derby Division of the HRR. Once this trackage was in place, however, Botsford became a busy junction point for the
HRR system. Considerable amounts of freight moved in and out of New Haven to points west over the NY&NE via Hawleyville,
or from there down the HRR's leased Danbury and Norwalk RR to Wilson Point and thence to New York by water.

|
| Thomas J. Dodd Research Center, UConn |
[5.24] Botsford station. In
1888, on the opening of the Extension, you could change here to go south to Bridgeport, or north for connections at Hawleyville,
further north to the Berkshires, Pittsfield, or Albany and points west. Danbury also was accessible from Brookfield Jct.
via the HRR's branch to the Hat City, the old New York, Housatonic and Northern RR.

|
| Thomas J. Dodd Research Center, UConn |
[5.25] This is the view
that southbound HRR trains would see coming into Botsford. Out of sight up ahead is the wye, with the leg to the right going
south to Bridgeport and the one to the left taking you down the Extension to Derby Jct., Tyler City, and ultimately
New Haven. Those familiar with this location will note that the grade crossing the farmer has just used is has been replaced
by the overgrade railroad bridge that is still in use today. The windmill is supplying
water for the massive tank that is behind the freight house and just below the line
of sight. The Newtown Bee reported in 1904 that the
windmill had just been installed [NB/08/05/1904/01]. It would be replaced later by a pumping engine. Since the grade crossing would be eliminated
ca. 1912 with the double-tracking of the Maybrook Line, the 1907 date claimed for this photo is quite plausible. Click here for more on Botsford and see also Shoreliner 11.1.25-26 (1980).

[5.25.1] This shot shows Botsford on the 1915 valuation map, replicating the south-looking
scene just above. Click here for the larger map section. The accumulated changes that occurred at Hawleyville are shown starting with the 1840
HRR line, the 1887 wye and track realignments for the Extension, and finally the 1912 double-tracking of the
Extension as the Maybrook freight line. Developments like these often obliterated the former right of way, as seen
here where the passenger station (blue arrow) is astride the dashed line of the original HRR. For all of the care taken
with these maps, details were, inexplicably, sometimes omitted. The iconic Botsford water tank is not on the map where
it stood beyond the freight house, which is shown at the orange arrow. We are unaware of any reason why it would not have
been seen at the time the railroad's property was being valued.

|
| Richard A. Fleischer Photo |

|
| Richard A. Fleischer Photo |
[5.25.2]
These were views of Botsford on April 15, 1973. The passenger station was
still standing then and in use as a woodworking shop. The venerable old water tower was also still in place with the pump
house serving as the mechanism for feeding the tank after the windmill was removed. All this of course was moot after steam
disappeared as a source of motive power in the 1950s. With the exception of the vehicles behind the station, the
scene is one of utter abandonment, captured here in black and white like shots of deserted western ghost towns. One might
have expected to see a tumbleweed rolling along.

|
| Photo - Copyright John Babina Jr. 1981 all rights reserved |
[5.26] The Botsford water tower stood here
until being dismantled some time later in 1981 after this picture was taken. It is reportedly in the care of the Danbury Railway
Museum and will be resurrected there. That has not been done as of January 2009.
|